The Belwind offshore wind project

 

Belwind is the second project of the Belgian North Sea and the first Parkwind project. The Belwind wind farm comprise 55 Vestas turbines with a 165 MW capacity. An additional Haliade wind turbine was added as a part of a demonstration project, raising the installed capacity to 171 MW.

The Belwind turbines are operational and produce green energy since 2010 (Vestas turbines) and 2013 (Haliade turbine).

Turbines

Foundation:Monopile
Height:117 m
Rotor diameter:90 m

 

Location

Depth:15 to 37 m
Distance to shore:46 km
Surface:17 kmĀ²