Turbines
| Foundation: | 6x Gravity Based, 48x Jacket |
|---|---|
| Height: | 158 m |
| Rotor diameter: | 126 m |
Location
| Depth: | 14 to 28 m |
|---|---|
| Distance to shore: | 30 km |
| Surface: | 19,84 km² |
C-Power is the first project of the Belgian North Sea. The C-Power wind farm comprises 54 Senvion turbines with a 325 MW capacity.
The C-Power turbines are operational and produce green energy since 2009 (phase 1), 2012 (phase 2) and 2013 (phase 3).
| Foundation: | 6x Gravity Based, 48x Jacket |
|---|---|
| Height: | 158 m |
| Rotor diameter: | 126 m |
| Depth: | 14 to 28 m |
|---|---|
| Distance to shore: | 30 km |
| Surface: | 19,84 km² |